Skip to content
  • SR Blog
  • Admin
Southwold Railway Trust

Southwold Railway Trust

England's premier 3-foot gauge railway

Menu

  • Home
  • SR Shop
  • History
    • Railway Map
  • SR Blog
  • Trust Projects
    • Southwold Railway Steamworks
    • Scaldwell
    • Heritage Train Project
    • Trackbed Fund
    • Wenhaston Station Project
    • Project Blyth
  • Public Open Days
  • Links
  • Contact Us

Wagon Rebuild

Van 40’s underframe nears completion, and Coach 7 shines

Van 40’s underframe nears completion, and Coach 7 shines

By the end of the second May Bank Holiday weekend, the Trust’s rolling stock was visibly moving on. Coach 7’s body is complete outside (except for some more work on some of the doors), and is resplendent in maroon, cream

SRT Blogger May 26th, 2014January 3rd, 2019 Carriage Restoration, Historical, Rolling Stock, Wagon Rebuild Read more

A Coach moves, and an Underframe nears completion

A Coach moves, and an Underframe nears completion

On a Saturday and a Wednesday in early May, volunteers managed to tick off a number of outstanding jobs, and make good progress with others. The exterior of coach 7 (apart from the doors) is now close to completion –

SRT Blogger May 13th, 2014January 3rd, 2019 Carriage Restoration, Rolling Stock, Wagon Rebuild Read more

Visible progress with rolling stock

Visible progress with rolling stock

A number of scheduled workparties, and one or two extra days, have really started to show results with coach 7 and the wagon underframe. Panelling for the coach Southwold end is measured for order, a great deal of finicky work

SRT Blogger April 10th, 2014January 7th, 2019 Carriage Restoration, Rolling Stock, Wagon Rebuild Read more

Work on two vehicles – new SR track gauges – and a tidy workshop!

Work on two vehicles – new SR track gauges – and a tidy workshop!

On Wednesday March 5th, Rolling Stock Group volunteers cleared the inner and outer parts of the workshop, tidying away building materials, timber and assorted bits and pieces. All our (increasingly large numbers of) tools are now logically distributed on the

SRT Blogger March 5th, 2014January 3rd, 2019 Carriage Restoration, Rolling Stock, Wagon Rebuild Read more

Rolling Stock Group – some satisfying achievements

Rolling Stock Group – some satisfying achievements

On Saturday March 1st, the SR volunteers ticked off a job which has been worked on, on and off, for some months. The steel frame of the coach sides having previously been treated for rust and painted, the new treated

SRT Blogger March 2nd, 2014January 3rd, 2019 Carriage Restoration, Rolling Stock, Wagon Rebuild Read more

Good Progress on Coach and Van

Good Progress on Coach and Van

Southwold Railway (replica) van 40 took a giant step forward on 1st February. The special-cut hardwood (sapele mahogany in this case) for the solebars and plates has been delivered, and we immediately started rebating the solebars (each is 10 feet

SRT Blogger February 3rd, 2014January 3rd, 2019 Carriage Restoration, Rolling Stock, Wagon Rebuild Read more

Rolling Stock Group Progress

Rolling Stock Group Progress

Our first Rolling Stock Group workday of 2014 saw a really gratifying turnout of eleven volunteers, who braved the cold and occasional drizzle (though even outside the workshop itself, we and the stock are well protected by a temporary building),

SRT Blogger January 5th, 2014December 31st, 2018 Carriage Restoration, Rolling Stock, Wagon Rebuild Read more

Coach and wagon progress

Coach and wagon progress

The Rolling Stock Group have been making good progress with Coach 7 (the tram trailer) and the regauged chassis for the SR covered van.  The picture shows us painting  the coach roof, after the rubbing down and priming had been

SRT Blogger October 28th, 2013December 31st, 2018 Carriage Restoration, Rolling Stock, Wagon Rebuild Read more

Rolling Stock Group – February 2013

Rolling Stock Group – February 2013

The chassis components for our replica SR covered van arrived back from Peggs of Aldeburgh on 1 Feb., transported courtesy of Duncan’s Builders.  Peggs have done a very nice job with the new axles, and have also welded in around

SRT Blogger March 8th, 2013December 31st, 2018 Rolling Stock, Wagon Rebuild Read more
  • Next »

Recent Railway Blogs

  • Blyth Progress
  • Open Days for 2025 Commence
  • Locomotive arrives on loan
  • Final holes plugged on Blyth’s boiler

Railway Blog Archives

Blog Categories

  • Blyth Valley Light Railway (60)
  • Events (59)
  • Guest Blogs (7)
    • Mr Awkward's Workshop Diary (7)
  • Halesworth Locomotive Shed (8)
  • Heritage Train Project (57)
  • Historical (17)
  • Other Railways (8)
  • Permanent Way (25)
  • Rolling Stock (147)
    • 2-4-0 Club (34)
    • Blyth (6)
    • Carriage Restoration (32)
    • Chassis Restoration (4)
    • LM319 (2)
    • Motor Rail SR No. 5 (33)
    • Scaldwell (17)
    • Wagon Rebuild (39)
  • SR Models (11)
  • SRT Shop (14)
  • Steamworks Project (141)
  • Uncategorized (8)
  • Wenhaston Station Project (103)

Subscribe to SR Blog Updates

Join this list to get an email everytime we post a new item on the SR Blog
Loading

Copyright © 2025  - Southwold Railway Trust is a Registered Charity (No. 1117041) and a Company registered in England No. 5894122  VAT: GB 977 0266 90
Website created and hosted by MHCreations