Well, much seems to have occurred since the previous blog. There we were planning an opening at Easter and then the sky falls in. But we must keep calm and carry on – indoors. One of us is self-isolating down
A sign of spring at Steamworks! Toby hard at work on the upgrading often BVLR track. Some groundwater drainage was installed last Wednesday so hopefully this will deal with the flooding there. Well, it was the wettest February on record.
A busy day for the volunteers at Steamworks this Saturday. Pippa planting a dogwood at the back of the site. Thanks to those who have donated trees. We cannot have too many! Rabbit proof chicken wire is an essential down
Our builders have completed their contract for the Engine Shed Phase 2 – before Easter as promised. We will fit the main doors and the vent above. That is going to be the new metal-working shop on the photo below.
A real milestone weekend for the Trust. With a little help from our friends – two dozen army reservists from STRE 507 – a lot (70m) of three foot gauge track, with two sets of points, has been installed over
First of all to remind you that we have an Open Day at Steamworks in Blyth Road, Southwold from 10,30am to 4pm this coming Saturday 28th December, 2019. Entry is free but there are £2 rides on the miniature railway.