Skip to content
  • SR Blog
  • Admin
Southwold Railway Trust

Southwold Railway Trust

England's premier 3-foot gauge railway

Menu

  • Home
  • SR Shop
  • History
    • Railway Map
  • SR Blog
  • Trust Projects
    • Southwold Railway Steamworks
    • Scaldwell
    • Heritage Train Project
    • Trackbed Fund
    • Wenhaston Station Project
    • Project Blyth
  • Public Open Days
  • Links
  • Contact Us

28th June 2018

I was asked to give a talk on the railway for the Southwold Arts Festival this morning.

Photos taken this morning of the Station. We are getting there. Drainage is in now.

Yesterday we had the first trial of the BVLR with the new Express and twelve passengers. If someone sends me a picture I will post it.

JB

28th June 2018
SRT Blogger June 28th, 2018January 22nd, 2019 Blyth Valley Light Railway, Steamworks Project
  • ← Blyth Road 26.6.18
  • Blyth Road, July 4th 2018 →

Recent Railway Blogs

  • Blyth Progress
  • Open Days for 2025 Commence
  • Locomotive arrives on loan
  • Final holes plugged on Blyth’s boiler

Railway Blog Archives

Blog Categories

  • Blyth Valley Light Railway (60)
  • Events (59)
  • Guest Blogs (7)
    • Mr Awkward's Workshop Diary (7)
  • Halesworth Locomotive Shed (8)
  • Heritage Train Project (57)
  • Historical (17)
  • Other Railways (8)
  • Permanent Way (25)
  • Rolling Stock (147)
    • 2-4-0 Club (34)
    • Blyth (6)
    • Carriage Restoration (32)
    • Chassis Restoration (4)
    • LM319 (2)
    • Motor Rail SR No. 5 (33)
    • Scaldwell (17)
    • Wagon Rebuild (39)
  • SR Models (11)
  • SRT Shop (14)
  • Steamworks Project (141)
  • Uncategorized (8)
  • Wenhaston Station Project (103)

Subscribe to SR Blog Updates

Join this list to get an email everytime we post a new item on the SR Blog
Loading

Copyright © 2025  - Southwold Railway Trust is a Registered Charity (No. 1117041) and a Company registered in England No. 5894122  VAT: GB 977 0266 90
Website created and hosted by MHCreations