Wednesday March 12th saw a Wenhaston team onsite in the now-expected, but still unseasonal, sunshine. The main job on hand was to mark each chain end along the trackbed, so that the survey can have points for measurement – and
188 feet of rail for the new Southwold Railway
On the morning of Saturday 15th March, volunteers – with the essential help of Wenhaston member Roger Desborough and his tractor and trailer – collected around 188 feet of rail from two locations. Thanks to the generosity of the Trustees
Work on two vehicles – new SR track gauges – and a tidy workshop!
On Wednesday March 5th, Rolling Stock Group volunteers cleared the inner and outer parts of the workshop, tidying away building materials, timber and assorted bits and pieces. All our (increasingly large numbers of) tools are now logically distributed on the
Rolling Stock Group – some satisfying achievements
On Saturday March 1st, the SR volunteers ticked off a job which has been worked on, on and off, for some months. The steel frame of the coach sides having previously been treated for rust and painted, the new treated